• Hydro Electrical Power Plants
  • AGUS II
    • Installed Capacity: 180 MW (3x60MW)
    • Scheme of Development: Surface Powerhouse
    • Location: Saguiaran, Lanao Del Sur
    • Scope of Works:
    1. Civil Works- Site Development
    Concrete Lined Approach Channel of 680 linear meter
    2. Power Intake Structures: 3 lines of 4,500 meter diameter
    3. Steel pen Stocks: 350 meters each and 3 6,000 meter diameter x 37 meter steel surge tanks
    4. Powerhouse Structure to House: 3-60MW
    5. Turbine Generators
    6. Tailrace Outlet Channel
    7. Administration Building Installation: 270 Toner Gantry Crane