• Hydro Electrical Power Plants
  • AGUS VI
    • Additional Installed Capacity: 50 MW; Bringing the total 200 MW
    • Scheme of Development: Surface Powerhouse
    • Location: Iligan City
    • Scope of Works:
    1. Civil Works
    (a) Dam
    (b) Dyke
    (c) Approach Channel
    (d) Road Embankment
    (e) Power Intake
    (f) Cut and Cover
    (g) Inclined Shaft and Horizontal Tunnel