• Manapla 48MW Solar Power Plant
  • Construction of Manapla 48MW Solar Power Plant

    The works consist of the following:
    Electrical:
    1. 50MWVA, 69kV Substation
    2. 13.8kV Main switch gear
    3. Auxiliary Power
    4. 23 Medium Voltage Power Station (MVPS) with 45 Inverter
    Civil:
    1. Roadworks
    2. Control Building, Guardhouse, Sentry Tower and Radio Room
    3. Drainage
    4. Perimeter Fence